Stratford Public Schools

School Construction in Stratford OK

Stronghold Construction is building a new classroom building for Stratford Public Schools in Stratford, Oklahoma. The single-story, roughly 12,000 SF building pairs a pre-engineered metal structure with a brick veneer exterior and a covered canopy.

Designed by Redland Childers Architects, the project runs on a 240-day construction schedule under a stipulated-sum agreement. The building slab was placed in November 2026, with completion targeted for spring 2027.

Crew preparing the slab for the new Stratford classroom building

Project Overview

New K-12 Classroom Space

The new building adds permanent classroom space on the district's Stratford campus. A pre-engineered metal building frame keeps the structure efficient, while brick veneer gives it the look and durability of a permanent school facility.

Stronghold is managing sitework, underground utilities, the building slab, the steel package, enclosure and interior build-out as the K-12 school contractor, coordinating closely with the architect and district throughout construction.

Fresh concrete slab at the Stratford Public Schools new classroom building

Project Details

K-12 Classroom Construction

Client: Stratford Public Schools

Location: Stratford, Oklahoma

Architect: Redland Childers Architects

Delivery Method: Design-Bid-Build (Stipulated Sum)

Project Type: K-12 Education / New Construction

Building Size: ~12,000 Square Feet

Structure: Pre-Engineered Metal Building with Brick Veneer

Status: Under Construction

Target Completion: Spring 2027

Concrete crew placing the building slab in Stratford, Oklahoma

Project Goals

Classroom Expansion
Goals

The project is driven by several critical objectives:

01. Add permanent classroom space for Stratford students

02. Build an efficient steel structure with a durable brick exterior

03. Hold the 240-day construction schedule

04. Keep the site safe and separated from school activities

05. Deliver a finished building ready for students in 2027

Key Challenges

Working on a School Campus

The site is fenced and the work coordinated around the district's daily operations and student traffic.

Weather and Site Drainage

Fall rain left standing water on site, requiring careful scheduling of excavation, base and slab work.

Slab Coordination

Underground plumbing, electrical and the vapor barrier had to be complete and inspected before the building slab could be placed.

Excavation for underground utilities at the Stratford school site
Stronghold Construction icon

Schedule x Communication

Rural districts do not get many chances to build. Stronghold is treating Stratford's new classroom building that way, with tight schedule control, clear weekly communication with the district and architect, and a finished building ready for students in 2027.

Ready to start your next project?

We specialize in solving complex construction challenges through close collaboration.

Previous
Previous

Chickasaw Nation Cleaning & Sanitizing Facility

Next
Next

OU Max Westheimer Airport Hangar