Seminole Nation Roads & Trails Program
Tribal Road Construction in Seminole County OK
The Roads & Trails Program was the first package of work Stronghold Construction delivered for the Seminole Nation of Oklahoma. Funded with federal highway dollars, the program grouped road, trail, parking and facility projects into a single CM/GC program with Stronghold as construction manager of record.
Projects in the program include the reconstruction of Econtuchka Road, new roads and trails on the Mekusukey Mission grounds, Mekusukey Mission parking lots, the Seminole Nation Department of Transportation vehicle maintenance facility and the Home Health building.
Project Overview
Multi-Project CM/GC Program
Rather than bidding each project separately, the Nation used a CM/GC program so one construction manager could plan, price and sequence the work as a whole. Stronghold managed design coordination, procurement and construction across the program, matching the work to the available federal funding.
On the Mekusukey Mission grounds, the program delivered new asphalt roads, concrete trails and walkways, and paved parking connecting the mission's buildings and gathering spaces. Off campus, Econtuchka Road was rebuilt with new drainage culverts, a rebuilt base and fresh asphalt paving.
Project Details
CM/GC Roads & Facilities Program
Client: Seminole Nation of Oklahoma
Location: Seminole County, Oklahoma
Delivery Method: CM/GC
Program Type: Roads, Trails, Parking & Facilities
Funding: Federal Highway Funds
Projects: Econtuchka Road, Mekusukey Mission Roads & Trails, Mekusukey Mission Parking Lots, SNDOT Vehicle Maintenance Facility, Home Health Building
Change Orders: Zero
Project Goals
Infrastructure
Program Goals
The program was driven by several critical objectives:
01. Manage multiple transportation projects under one accountable CM/GC team
02. Put federal highway funding to work efficiently and on schedule
03. Improve safe access across the Mekusukey Mission grounds
04. Rebuild Econtuchka Road with durable drainage and paving
05. Hold the program to zero change orders
Key Challenges
Program-Level Budgeting
Several projects had to be priced and prioritized against one funding source, so scope and sequencing decisions were made at the program level.
Drainage and Culverts
Econtuchka Road needed new culvert crossings and drainage work before the road could be rebuilt and paved.
Building on Mission Grounds
Roads, trails and parking had to be built around existing buildings, mature trees and gathering areas on the Mekusukey Mission campus.
Program Management x Accountability
The Roads & Trails Program set the model Stronghold has used with the Seminole Nation since: one CM/GC team accountable for the whole program, open-book pricing and work sequenced to the funding. The program has been delivered with zero change orders.