Mekusukey Mission Water & Wastewater

Water & Wastewater Construction in Seminole OK

Stronghold Construction is rebuilding the water and wastewater systems serving the Seminole Nation's Mekusukey Mission grounds near Seminole, Oklahoma. Funded through the Nation's ARPA Capital Program, the work replaces aging, largely unmapped utilities with engineered, documented infrastructure across the campus.

The package covers sanitary sewer and lagoon improvements, a new water service to the mission's existing water tower, and new wells and well houses. Stronghold is delivering the work under a CM/GC agreement in joint venture with WDS Contracting.

Crew installing sanitary sewer pipe in a trench at Mekusukey Mission

Project Overview

Campus-Wide Utility Renewal

Much of the mission's sewer and water piping was decades old and had never been fully mapped. Stronghold's team evaluated the systems campus-wide, worked with the engineers to design the corrections, and has been replacing and rerouting lines across the mission grounds while improving the sanitary sewer and lagoon system.

Preconstruction also looked at replacing the mission's water tower. Through Stronghold's engineering review, the existing tower was optimized and kept in service instead of replaced, and a new water service was brought to it.

Geomembrane-lined lagoon cell with sandbag ballast at Mekusukey Mission near Seminole, OK

Project Details

CM/GC Utility Infrastructure

Client: Seminole Nation of Oklahoma

Location: Mekusukey Mission, Seminole, Oklahoma

Delivery Method: CM/GC (Joint Venture with WDS Contracting)

Project Type: Water & Wastewater Infrastructure

Scope: Sanitary Sewer, Lagoon, Water Service, Wells & Well Houses

Program: Seminole Nation ARPA Capital Program

Status: Under Construction

Target Completion: December 31, 2026

Lagoon liner along the graded berm at Mekusukey Mission in Seminole County, Oklahoma

Project Goals

Reliable Utilities
for the Mission Grounds

The project is driven by several critical objectives:

01. Locate, evaluate and document aging utilities across the entire mission grounds

02. Correct sewer and water deficiencies with engineered, permanent solutions

03. Improve the sanitary sewer and lagoon system serving the campus

04. Deliver a new water service to the existing water tower and keep it in service

05. Build new wells and well houses for the mission's water system

Key Challenges

Unmapped Infrastructure

Decades-old sewer and water lines had little or no record documentation, so crews had to locate and verify existing utilities before new work could be designed and installed.

Campus-Wide Footprint

Trenching and utility work had to be phased across the mission grounds to keep roads, buildings and services usable during construction.

The Water Tower Decision

Replacing the water tower was part of early planning. Stronghold's engineering review found a way to optimize and keep the existing tower in service instead.

Dozer grading a new lagoon cell before liner installation at Mekusukey Mission
Stronghold Construction icon

Engineering x Stewardship

Stronghold's approach at Mekusukey Mission has been to find the problems first, mapping what was in the ground before designing what goes back in. The work is scheduled to reach substantial completion by December 31, 2026, leaving the Seminole Nation with documented, engineered water and wastewater systems across the mission grounds.

Ready to start your next project?

We specialize in solving complex construction challenges through close collaboration.

Previous
Previous

The Back Nine Golf

Next
Next

Pawnee Nation Solar Farm